$4.00Download, ready as soon as you pay
A two-page checklist to run through before the slack comes out: the load, the rigging, the area, the test lift, landing.
The checks a rigger makes on every lift, in the order they happen. Page one is the load, the rigging, and the area and the people. Page two is the test lift, moving and landing, and what to do after the lift, with room for notes and a signature.
You get the file by email the moment you pay. With an account at the school you also find it under Account, at any time.